| At the intersection of Canterbury Road/Grey Street and Fitzroy Street looking east; the old trackwork's concrete has been broken up and the rubble is being cleared away.
1600 x 1000 pixels: 380k |
| Stacks of sleepers in Canterbury Road.
1600 x 1000 pixels: 426k |
| The road breakers have worked as far west as Loch Street.
1600 x 1000 pixels: 534k |
| Rubble is being loaded onto tip trucks.
1600 x 1000 pixels: 448k |
| At the opposite end of the tramworks on the Upper Esplanade near Cavell Street, workers are welding the grooved rail into long lngths.
1600 x 1000 pixels: 436k |
| Once the rails are welded, they are picked up by a tractor and (rapidly and seeming effortlessly) dragged along the Esplanade to a stockpile near the Novotel hotel.
1600 x 1000 pixels: 390k |